What is a snag list?
A snag list records defects and unfinished work found during a site inspection before handover. What belongs on one, who writes it, when it happens, and how to make it actually get fixed.
Read the guide →Practical guides to snag lists, site inspections and handover — written for the people who actually walk the building.
A snag list records defects and unfinished work found during a site inspection before handover. What belongs on one, who writes it, when it happens, and how to make it actually get fixed.
Read the guide →Snag list and punch list describe the same thing in different places. Where each term is used, the small practical differences in how they are run, and which to use with an international team.
Read the guide →A room-by-room snagging checklist for new-build homes — what to check in every room, plus the exterior, services and documents most inspections miss.
Read the guide →The fields a snag list template actually needs, a copy-and-paste structure you can use today, and the reasons spreadsheet templates break down on real projects.
Read the guide →Practical completion is the moment a building is handed over — and the moment your leverage changes. What the term actually means, what to inspect before you sign, and the disagreements that come up every time.
Read the guide →The months after handover when the contractor must come back and put things right. What counts as a defect, what does not, how the end-of-period inspection works, and how retention is released.
Read the guide →A site inspection report is read by people who were not there, sometimes years later and sometimes by a lawyer. How to structure one, how to describe a defect so it gets fixed, and what photographs actually need to show.
Read the guide →Minutes are the project record, and on a contested job they are evidence. How to number points so they survive across meetings, write actions that get done, and handle the objection period.
Read the guide →What a professional snagging survey actually involves, what the report should contain, when to book it around your completion date, and how to use it once you have it.
Read the guide →Forty units, common parts and a phased handover break the methods that work fine on one house. How to number, sequence and track defects when the same fault repeats across every floor.
Read the guide →A photograph of a crack could be any wall in any building. What to shoot, how to show location and scale, what metadata matters, and why the timing of the shot decides whether it proves anything.
Read the guide →Four ways to run a snag list, and what each one costs you on a real job. Which template format survives photographs, revisions and a subcontractor who says he never received item 42.
Read the guide →A working Excel snag list: the exact column order, the four set-up steps that make it usable on site, how to issue it by trade, and the two things a spreadsheet cannot do.
Read the guide →A snagger is the person who inspects a building for defects before handover. Who does the job in practice, what an inspection day involves, when it is worth hiring one, and what separates a good snagger from an expensive walk-round.
Read the guide →The same job has a different name, a different deadline and a different safety net in every country. A quick guide to what snagging is called, when it happens and what protects you — across Europe, North America, the Middle East, Asia, Africa and Oceania — nineteen countries in all.
Read the guide →How snagging works in the UK — the pre-completion inspection under the New Homes Quality Code, the two-year builder period inside a 10-year warranty, the 30-day fix expectation, and practical completion on commercial jobs.
Read the guide →In Ireland, snagging a new home before closing is standard practice. When to do it, who to hire, why the list goes through your solicitor, and what structural cover like HomeBond does — and does not — protect you against.
Read the guide →Most new homes in Malta are apartments bought off plan. When to snag (before the final deed), who to ask (usually your perit), what to agree in the promise of sale, and the Civil Code rule that keeps the perit and contractor liable for serious defects for 15 years.
Read the guide →In the United States the snag list is a punch list. How it works on commercial jobs (substantial completion, the architect’s certificate, retainage and the one-year correction period) and on new homes (the final walkthrough and the builder warranty).
Read the guide →In Canada the snag list is a deficiency list. How the pre-delivery inspection and Tarion’s 30-Day and Year-End forms work in Ontario, the warranty ladders in other provinces, and deficiencies on commercial jobs.
Read the guide →In Australia snagging is the defects inspection at practical completion. How the defects liability period works on commercial jobs, and the statutory warranties that protect home owners — using NSW and Queensland as examples.
Read the guide →New Zealand gives home owners a 12-month defect repair period and implied warranties that last up to 10 years. How they work, why the completion date matters, and how to write a defects list your builder cannot dispute.
Read the guide →Snagging is routine for property handovers in Dubai and across the UAE. When to inspect (before you sign the handover), the one-year period for finishing defects, ten-year decennial liability for structural ones, and the second inspection most buyers forget.
Read the guide →In Singapore, new HDB flats and private condos come with a one-year defects liability period. When it starts, how to report defects, the longer cover for leaks and spalling concrete in HDB flats, and what CONQUAS scores do and do not tell you.
Read the guide →South African new homes registered with the NHBRC come with three layers of builder responsibility: three months for deviations from the plans, one year for roof leaks, and five years for major structural defects. How to snag at handover so you do not miss the first one.
Read the guide →In France, snagging means listing réserves on the handover report. How the procès-verbal works, the one-month window after you get the keys in an off-plan (VEFA) purchase, and the one-, two- and ten-year guarantees that follow.
Read the guide →In Germany everything turns on the Abnahme — the formal acceptance of building work. Why you must reserve known defects in the protocol, how precise each entry needs to be, and the five-year (BGB) or four-year (VOB/B) warranty that follows.
Read the guide →Dutch new-build buyers snag at the oplevering, with an opleverlijst of defects and often an independent inspector. The three-month maintenance period, the 5% rule that lets you hold back money with the notary, and the Woningborg and SWK warranties.
Read the guide →Snagging a new-build property in Spain, from the Costa del Sol to Madrid. When to inspect, why the handover matters, and the Building Act’s one-year (finishes), three-year (habitability) and ten-year (structure) guarantees.
Read the guide →Buying a new home in Portugal from a developer now comes with a ten-year warranty for structural defects and five years for other non-conformities. How to snag before the deed, how to report defects, and why the first inspection still matters.
Read the guide →In Italy the deadlines for building defects are short and strict. The 60-day notice and two-year limit for ordinary defects under the Civil Code, the ten-year liability for serious defects, and how to record defects at handover.
Read the guide →In Cyprus, a buyer’s protection against defects depends mostly on the contract of sale. What to put in it before you sign, why an independent snagging inspection at handover matters, and how to deal with a developer who does not come back.
Read the guide →Indian home buyers increasingly snag their flat at possession. How RERA protects you — a five-year period from possession for structural and workmanship defects, with repairs due within 30 days of written notice — and how to write a snag list the builder must act on.
Read the guide →In Qatar, snagging at handover is governed mainly by your contract and its defects liability period, while the Civil Code imposes strict ten-year liability for serious structural defects. How the two fit together, and how to snag a property in Doha.
Read the guide →